Products

Prefabricated Insulation Pipe ·

  • Pre-fabricated buried insulated pipes of WBR series

    Pre-fabricated buried insulated pipes of WBR series

    Prefabricated buried insulation pipe of WBR series

    Highly dense PE external pipes, PU foam and plastic Pre-fabricated buried insulated pipes, this pipes and fittings are mainly used for supplying warm water, cold water, air-conditioning water returns etc which needs transmission of insulated liquid water. Buried underground, it won’t affect vehicles, passengers, and plants around, so it is good for heat supply, with a wide selection of pipe materials and adapted to all kinds of project environment, widely applied in chemical & petrol pipes, central heat supply, central air-conditioning water return pipes, municipal projects pipes, heat supply pipes for buildings etc.

    Main performance

    Conveyed contents:warm water,cold water,etc
    Design temperature:T≤140℃
    Design pressure:≤2.5MPa
    Service life:30 years

    Pre-fabricated buried insulated pipes of WBR series

    Prefabricated buried insulation pipe of WBR series

    Highly dense PE external pipes, PU foam and plastic Pre-fabricated buried insulated pipes, this pipes and fittings are mainly used for supplying warm water, cold water, air-conditioning water returns etc which needs transmission of insulated liquid water. Buried underground, it won’t affect vehicles, passengers, and plants around, so it is good for heat supply, with a wide selection of pipe materials and adapted to all kinds of project environment, widely applied in chemical & petrol pipes, central heat supply, central air-conditioning water return pipes, municipal projects pipes, heat supply pipes for buildings etc.

     

    Main performance

    Conveyed contents:warm water,cold water,etc
    Design temperature:T≤140℃
    Design pressure:≤2.5MPa
    Service life:30 years

     

    Product composition

    01 Straight pipe:lead along the established direction of flow of fluid in the pipe fittings.

    02 Three-way pipe:the pipe on the main line and branch line connector fittings.

    03 Elbow pipe:directing fluid flows change direction in the core tube fittings.

    04 Elbow pipe:directing fluid flows change direction in the core tube fittings.

    05 Three-way pipe:the pipe on the main line and branch line connector fittings.

     
  • Prefabricated aerial steam insulation pipe of WBK series

    Prefabricated aerial steam insulation pipe of WBK series

    Prefabricated aerial steam insulation pipe of WBK series

    The pipes and fittings are mainly used for supplying steam, which is a new kind of pre-fabricated pipes. Pipes can be installed where is available, especially for the application of long distance heat supply network. This products use pre-fabricated complex insulated structure, breaking the technical obstruction for overhead steam pipes to be highly-effective, reach longer distance and cover larger areas.

    Main performance

    Conveyed contents:superheated steam,saturated steam,etc
    Design temperature:≤350℃
    Design pressure:≤4.0MPa
    Service life:30 years

    Prefabricated aerial steam insulation pipe of WBK series

    Prefabricated aerial steam insulation pipe of WBK series

    The pipes and fittings are mainly used for supplying steam, which is a new kind of pre-fabricated pipes. Pipes can be installed where is available, especially for the application of long distance heat supply network. This products use pre-fabricated complex insulated structure, breaking the technical obstruction for overhead steam pipes to be highly-effective, reach longer distance and cover larger areas.

     

    Main performance

    Conveyed contents:superheated steam,saturated steam,etc
    Design temperature:≤350℃
    Design pressure:≤4.0MPa
    Service life:30 years

     

    Product composition

    01 Straight pipe:lead along the established direction of flow of fluid in the pipe fittings.

    02 Three-way pipe:the pipe on the main line and branch line connector fittings.

    03 Fixed Pier:prevents pressure pipe by pressure or temperature effect of axial force due to pipe in the horizontal and vertical movement of      pipe fittings.

    04 Steam traps:exclude stress due to liquefaction of water accumulated in the pipe fittings.

    05 Elbow pipe:directing fluid flows change direction in the core tube fittings.

    06 Slide type bracket:in order to conform to the pressure pipe from internal pressure or temperature effect of axial force due to pipe in the      horizontal and vertical movement of accessories.

  • Pre-fabricated overhead insulated pipes of WBD series

    Pre-fabricated overhead insulated pipes of WBD series

    Prefabricated buried steam insulation pipe of WBD series

    The pipes and fittings are mainly used for supplying heated steam, buried underground, it won’t affect vehicles, passengers, and plants around, good for heat supply. This product is widely used in industries, such as: municipal heat supply, industrial facilities, paper-making, textile, chemical & petrol etc.

    Main performance

    Conveyed medium:superheated steam,saturated steam,etc
    Designed temperature:≤350℃
    Designed pressure:≤4.0MPa
    Service life:30 years

    Pre-fabricated overhead insulated pipes of WBD series

    Prefabricated buried steam insulation pipe of WBD series

    The pipes and fittings are mainly used for supplying heated steam, buried underground, it won’t affect vehicles, passengers, and plants around, good for heat supply. This product is widely used in industries, such as: municipal heat supply, industrial facilities, paper-making, textile, chemical & petrol etc.

     

    Main performance

    Conveyed medium:superheated steam,saturated steam,etc
    Designed temperature:≤350℃
    Designed pressure:≤4.0MPa
    Service life:30 years


    Product composition

    01 Straight pipe:lead along the established direction of flow of fluid in the pipe fittings.

    02 Straight pipe:lead along the established direction of flow of fluid in the pipe fittings.

    03 Three-way pipe:the pipe on the main line and branch line connector fittings.

    04 Buried type compensator:eliminating subparagraph duct by pressure or temperature induced by axial force produced by axial      displacement of the tube fittings.

    05 Fixed Pier:prevent pipe tube and casing in the horizontal and vertical displacement of the pipe fitting.

    06 Buried type steam traps:exclude construction of buried pipe due to liquefaction phenomenon or water pipes.

    07 Elbow pipe:directing fluid flows change direction in the core tube fittings.

    08 Elbow pipe with traps:directing fluid in the core tube change direction and exclude the construction of buried pipe due to liquefaction      phenomenon or water pipes.

    09 Energy-saving rainhat: prevent the pipe core pipe and casing inlet and contact between tube and heat transfer of pipe fittings.